ANSWERS: 1
-
The proper amount of chlorine utilized in spa maintenance is 3 to 5 ppm, or 3 to 5 parts chlorine per million parts water. However, when administering a chlorine shock after a water change, the chlorine level can be raised to 30 to 50 ppm and allowed to drop back to 3 to 5 ppm.
Source:
Copyright 2023, Wired Ivy, LLC